Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Alkass, S, Aronian, A and Moselhi, O (1993) Computer‐Aided Equipment Selection for Transporting and Placing Concrete. Journal of Construction Engineering and Management, 119(03), 445–65.

Beliveau, Y, Dixit, S and Dal, T (1993) Dynamic Damping of Payload Motion for Cranes. Journal of Construction Engineering and Management, 119(03), 631–44.

Bernold, L E and Guler, N (1993) Analysis of Back Injuries in Construction. Journal of Construction Engineering and Management, 119(03), 607–21.

Gonzalez‐Quevedo, A A, AbouRizk, S M, Iseley, D T and Halpin, D W (1993) Comparison of Two Simulation Methodologies in Construction. Journal of Construction Engineering and Management, 119(03), 573–89.

Hadavi, A and Krizek, R J (1993) Short‐Term Goal Setting for Construction. Journal of Construction Engineering and Management, 119(03), 622–30.

Halpin, D W (1993) Process‐Based Research to Meet the International Challenge. Journal of Construction Engineering and Management, 119(03), 415–25.

Hicks, J C (1993) Haul‐Unit Performance. Journal of Construction Engineering and Management, 119(03), 646–53.

Hornaday, W C, Haas, C T, O'Connor, J T and Wen, J (1993) Computer‐Aided Planning for Heavy Lifts. Journal of Construction Engineering and Management, 119(03), 498–515.

  • Type: Journal Article
  • Keywords: Computer applications; Lifting; Planning; Automation; Cranes; ASCE Awards & Prizes;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:3(498)
  • Abstract:
    This article presents research into automating some lift planning practices common to industrial construction contractors and owners. A detailed investigation of heavy‐lift planning methods was conducted through a series of interviews and lift studies with expert lift planners. This investigation documented a wide variety of manual and computer‐aided lift planning methods to perform similar types of planning tasks. Based on the information collected from these interviews and lift studies, a structured systems model was developed of the typical heavy‐lift planning process. This structured model is used as an architecture for the development of computer software to aid key planning tasks. An examination of major planning tasks indicates that significant reductions in direct planning costs and indirect construction heavy‐lift costs are possible through the implementation of computer‐aided planning procedures. Computer‐aided procedures would also improve the overall quality of lift planning practices through the automation of tasks which are difficult to perform and are critical to heavy‐lift planning accuracy.

Laufer, A, Shapira, A, Cohenca‐Zall, D and Howell, G A (1993) Prebid and Preconstruction Planning Process. Journal of Construction Engineering and Management, 119(03), 426–44.

Mallon, J C and Mulligan, D E (1993) Quality Function Deployment—A System for Meeting Customers' Needs. Journal of Construction Engineering and Management, 119(03), 516–31.

McCahill, D F and Bernold, L E (1993) Resource‐Oriented Modeling and Simulation in Construction. Journal of Construction Engineering and Management, 119(03), 590–606.

Moselhi, O, Hegazy, T and Fazio, P (1993) DBID: Analogy‐Based DSS for Bidding in Construction. Journal of Construction Engineering and Management, 119(03), 466–79.

Pau, S H, Chau, K W and Wong, W G (1993) Prospects for No‐Dig Technology in Hong Kong Construction Industry. Journal of Construction Engineering and Management, 119(03), 550–9.

Recarte Suazo, G A and Jaselskis, E J (1993) Comparison of Construction Safety Codes in United States and Honduras. Journal of Construction Engineering and Management, 119(03), 560–72.

Slaughter, E S (1993) Builders as Sources of Construction Innovation. Journal of Construction Engineering and Management, 119(03), 532–49.

Zack, J G (1993) “Claimsmanship”: Current Perspective. Journal of Construction Engineering and Management, 119(03), 480–97.